List of Publications


Refereed Journals : : Refereed Conferences : : Books and Book Chapters : : Other Publications


Refereed Journal Publications Google Scholar Profile Google Scholar Profile

Weerapperuma, U. S., Rathnasinghe, A. P., Jayasena, H. S., Wijewickrama, C. S., & Thurairajah, N. (2023). A knowledge framework for blockchain-enabled smart contract adoption in the construction industry. Engineering, Construction and Architectural Management, ahead-of-print. [ DOI Link ] [ RG Link ]

Jayasena, H. S., Thurairajah, N., Perera, B. A. K. S., & Siriwardena, M. (2023). Affordance-led framework of understanding of BIM adoption. Archnet-IJAR: International Journal of Architectural Research, ahead-of-print. [ DOI Link ] [ RG Link ] [ Synopsis ]

Weerasinghe, L. N., Rathnasinghe, A. P., Jayasena, H. S., Thurairajah, N., & Thayaparan, M. (2023). Can lean principles assist to reduce BIM implementation costs? A contemporary application of lean principles to the Sri Lankan construction industry. Benchmarking: An International Journal, ahead-of-print. [ DOI Link ] [ RG Link ] [ Synopsis ]

Rathnasiri, P., & Jayasena, S. (2022). Green building information modelling technology adoption for existing buildings in Sri Lanka. Facilities management perspective. Intelligent Buildings International, 14(1), 23–44. [ DOI Link ] [ RG Link ] [ Synopsis ]

Rathnasinghe, A. P., Kulatunga, U., Jayasena, H. S., & Wijewickrama, M. K. C. S. (2022). Information flows in a BIM enabled construction project: Developing an information flow model. Intelligent Buildings International, 14(2), 190–206. [ DOI Link ] [ RG Link ]

Ariyachandra, M. R. M. F., Jayasena, H. S., & Perera, B. A. K. S. (2022). Competencies Expected from an Information Manager Working in BIM Based Projects. International Journal of Construction Education and Research, 18(1), 49–66. [ DOI Link ] [ RG Link ]

Tennakoon, T. M. M. P., Kulatunga, U., & Jayasena, H. S. (2022). Influence of organisational culture on knowledge management in BIM-enabled construction environments. VINE Journal of Information and Knowledge Management Systems, 52(2), 224–242. [ DOI Link ] [ RG Link ]

Perera, G. P. P. S., Tennakoon, T. M. M. P., Kulatunga, U., Jayasena, H. S., & Wijewickrama, M. K. C. S. (2021). Selecting suitable procurement system for steel building construction. Built Environment Project and Asset Management, 11(4), 611–626. [ DOI Link ] [ RG Link ]

Rathnasiri, P., Jayasena, S., & Siriwardena, M. (2020). Assessing the Applicability of Green Building Information Modelling for Existing Green Buildings. International Journal of Design & Nature and Ecodynamics, 15(6), 763–776. [ DOI Link ] [ RG Link ]

Giuliani, L., Revez, A., Sparf, J., Jayasena, S., & Havbro Faber, M. (2016). Social and technological aspects of disaster resilience. International Journal of Strategic Property Management, 20(3), 277-290. [ DOI Link ] [ RG Link ]

Tan, W., & Suranga, H. (2008). Winner’s Curse in the Sri Lankan Construction Industry. The International Journal of Construction Management , 8(1), 29-35. [ DOI Link ] [ RG Link ] [ Synopsis ]

Zainudeen, N., Senaratna, S., Jayasena, S., & Rameezdeen, R. (2006). Horizontal housing property market. Built-Environment Sri Lanka , 7(1), 16-22. [ DOI Link ]

Refereed Conference Publications

Jayasena, H. S. (2024). O2E2: A framework for evolving cost estimation in BIM workflow. 12th World Construction Symposium – 2024, 802–814. [ DOI Link ] [ RG Link ]

Saparamadu, P. V. I. N., Jayasena, H. S., & Eranga, B. A. I. (2024). Blueprint for a natural language processing powered nexus for regulatory and legal landscape in construction. 12th World Construction Symposium – 2024, 306–317. [ DOI Link ] [ RG Link ]

Guruge, K., Waidyasekara, K. G. A. S., Jayasena, H. S., & Manewa, R. M. A. S. (2024). Unveiling the potential of design for deconstruction in the circular economy. 12th World Construction Symposium – 2024. [ DOI Link ] [ RG Link ]

Perera, B. K. C., Jayasena, H. S., Waidyasekara, K. G. A. S., Siriwardena, M., & Kahandawa, K. A. R. V. D. (2024). Managing BIM Implementation in the AEC Sector: Identifying Key Aspects and Developing a Framework. In J. O. B. Rotimi, W. M. Shahzad, M. Sutrisna, & R. Kahandawa (Eds.), Advances in Engineering Management, Innovation, and Sustainability (pp. 345–365). Springer Nature Switzerland. [ DOI Link ] [ RG Link ]

Thennakoon, T. M. P. N., Jayasena, H. S., & Weerapperuma, U. (2023). Investigating the motivation for implementing unsolicited proposals in the Sri Lankan construction industry. Proceedings of the 11th World Construction Symposium. Colombo, Sri Lanka. [ DOI Link ] [ RG Link ]

Jayaruwan, S.M.R., Jayasena, H.S., & Weerapperuma, U. (2023). Minimising Logistic Cost of Construction Materials in the Construction Industry: Contractor’s Perspective. Proceedings of the 11th World Construction Symposium. Colombo, Sri Lanka. [ DOI Link ] [ RG Link ]

Weerapperuma, U., Jayasena, S., Rathnasinghe, A., Thurairajah, N., 2022. The impact of professionals’ knowledge on innovation adoption in the construction industry: A critical literature review. In: Sandanayake, Y.G., Gunatilake, S. and Waidyasekara, K.G.A.S. (eds). Proceedings of the 10th World Construction Symposium, 24-26 June 2022, Sri Lanka. [Online]. pp. 896-908. [ DOI Link ]

Hewamulla, K., Jayasena, H., & Guruge, K. (2022). The Impact of Procurement Method on Construction Time Waste. Proceedings of the 10th World Construction Symposium, 909–920. [ DOI Link ] [ RG Link ]

Welikala, D.H.N., Jayasena, H.S. and Perera, B.K.C., 2022. Level of risk management knowledge amongconstruction project managers in Sri Lanka. In: Sandanayake, Y.G., Gunatilake, S. and Waidyasekara,K.G.A.S. (eds). Proceedings of the 10th World Construction Symposium, 24-26 June 2022, Sri Lanka.[Online]. pp. 637-647. [ DOI Link ]

Perera, K., & Jayasena, H. (2022). Regularities and Patterns of Construction Costs upon Political Events. Proceedings of the SLIIT International Conference on Engineering and Technology, 103–114. [ DOI Link ]

Weerasinghe, L. N. K., Jayasena, H. S., & Rathnasinghe, A. P. (2021). Potential of Lean to Minimise Implementation Costs of Building Information Modelling (BIM): A Conceptual Framework. Proceedings of the International Conference on Industrial Engineering and Operations Management, 72–82.

Rathnasinghe, A. P., Wijewickrama, M. K. C. S., Kulatunga, U., & Jayasena, H. S. (2020). Integration of BIM and Construction Supply Chain Through Supply Chain Management; An Information Flow Model. In R. Dissanayake & P. Mendis (Eds.), ICSBE 2018 (pp. 604–614). Springer Singapore. [ DOI Link ]

Jayasena, H. S., Thurairajah, N., Perera, B. A. K. S. & Siriwardena, M. (2019). Promotion of Diffusion of Innovations: A Study of BIM Adoption in Construction Industries. In: Gorse, C and Neilson, C J (Eds) Proceedings of the 35th Annual ARCOM Conference, 2-4 September 2019, Leeds, UK, Association of Researchers in Construction Management, 283-292.

Punnyasoma, J.A.G., Jayasena, H.S. and Tennakoon, T.M.M.P., (2019). Use of BIM solutions to facilitate value management. In: Sandanayake, Y.G., Gunatilake, S. and Waidyasekara, A. (eds). Proceedings of the 8th World Construction Symposium, Colombo, Sri Lanka, 8-10 November 2019, pp. 598-607.

Lakmal, D., Kugathasan, K., Nanayakkara, V., Jayasena, S., Perera, A. S., & Fernando, L. (2019). Brown Planthopper Damage Detection using Remote Sensing and Machine Learning. 2019 18th IEEE International Conference on Machine Learning and Applications (ICMLA), 97–104. [DOI] [RG]

Perera, G.P.P.S., Tennakoon, T.M.M.P., Kulatunga, U., Jayasena, H.S. and Wijewickrama, M.K.C.S., (2019). Factors affecting the selection of a procurement method for steel building construction. In: Sandanayake, Y.G., Gunatilake, S. and Waidyasekara, A. (eds). Proceedings of the 8th World Construction Symposium, Colombo, Sri Lanka, 8-10 November 2019, pp. 340-349.

Rathnasiri, P., & Jayasena, S. (2018). Green BIM for Existing Buildings. In S. Samarawickrama (Ed.), Proceedings of 11th International Conference of Faculty of Architecture Research Unit (FARU): “Sustainability for people” envisaging multi disciplinary solution (pp. 394–401). Galle, Sri Lanka.

Epasinghe, E.A.K., Jayasena, H.S., Kolugala L.M.B.N. & Wijewickrama, M.K.C.S. (2018). Open BIM Adoption in Sri Lankan Construction Industry. In proceedings of FOSS4G Asia 2018 Conference. Colombo: Department of Town and Country Planning, University of Moratuwa, Sri Lanka.

Tennakoon, T. M. M. P., Wijewickrama, M. K. C. S., Kulatunga, U., & Jayasena, H. S. (2018). Influence of Organisational Culture on Knowledge Management in a BIM Enabled Environment. In S. Samarawickrama (Ed.), Proceedings of 11th International Conference of Faculty of Architecture Research Unit (FARU): “Sustainability for people” envisaging multi disciplinary solution (pp. 147–154). Galle, Sri Lanka.

Ekanayake, M. G. C., Jayasena, H. S., & Kolugala, L. M. B. N. (2018). Potential of Applying Earned Value Management (EVM) as a Performance Evaluation Technique in Building Construction Projects in Sri Lanka. In Y. G. Sandanayake, S. Gunathilake, & K. G. A. S. Waidyasekara (Eds.), Proceedings of the 7th World Construction Symposium 2018 (pp. 423–429). Colombo, Sri Lanka: Ceylon Institute of Builders – Sri Lanka.

Irshad, M. T., & Jayasena, H. S. (2018). Perceived Negative Effects on Project Stakeholders from Adopting BIM in Sri Lanka. In Y. G. Sandanayake, S. Gunathilake, & K. G. A. S. Waidyasekara (Eds.), Proceedings of the 7th World Construction Symposium 2018 (pp. 413–422). Colombo, Sri Lanka: Ceylon Institute of Builders – Sri Lanka.

Rathnasinghe, A. P., Wijewickrama, M. K. C. S., Kulatunga, U., & Jayasena, H. S. (2018). Integration of BIM and Construction Supply Chain through Supply Chain Management; an Information Flow Model. The 9th International Conference on Sustainable Built Environment, 48–57. Kandy, Sri Lanka.

Sandaruwan, M. W. T., & Jayasena, H. S. (2018). Compatibility of BIM Based BoQ for Sri Lankan Construction Industry. In Y. G. Sandanayake, S. Gunathilake, & K. G. A. S. Waidyasekara (Eds.), Proceedings of the 7th World Construction Symposium 2018 (pp. 168–174). Colombo, Sri Lanka: Ceylon Institute of Builders – Sri Lanka.

Siriwardhana, M. S., Jayasena, H. S., Wijewickrama, M. K. C. S., & Kolugala, L. M. B. N. (2018). Suitable Government Initiative Strategy for BIM Implementation in Sri Lanka. In Y. G. Sandanayake, K. G. A. S. Waidyasekara, & S. Gunathilake (Eds.), Proceedings of the 7th World Construction Symposium 2018 (pp. 519–526). Colombo, Sri Lanka: Ceylon Institute of Builders – Sri Lanka.

Dissayayake, A. G. N. D., Jayasena, H. S., & Wijewickrama, M. K. C. S. (2018). Expected Impact on Design Delivery Risk in BIM Based Project Implementation in Sri Lanka. In S. Samarawickrama (Ed.), Proceedings of 11th International Conference of Faculty of Architecture Research Unit (FARU): “Sustainability for people” envisaging multi disciplinary solution (pp. 220–227). Galle, Sri Lanka.

Rathnasiri, H. W. T. P., Jayasena, H. S., & Madusanka, N. (2017). Adaptability of Green BIM Technology for the Green Buildings in Sri Lanka. In The 6th World Construction Symposium 2017: What’s New and What’s Next in The Built Environment Sustainability Agenda? (pp. 19–26). Colombo: Ceylon Institute of Builders – Sri Lanka.

Kumara, E. K. A. S., Jayasena, H. S., & Ariyachandra, M. R. M. F. (2017). Software Capabilities of Sri Lankan Architectural Professionals for BIM Adoption. In The 6th World Construction Symposium 2017: What’s New and What’s Next in The Built Environment Sustainability Agenda? (pp. 407–416). Colombo: Ceylon Institute of Builders – Sri Lanka.

Wijewickrama, M. K. C. S., Jayasena, H. S., & Ariyachandra, M. R. M. F. (2017). Challenges of Transcending BIM Information from Design Phase to Real Time On-site Construction Phase. In The 6th World Construction Symposium 2017: What’s New and What’s Next in The Built Environment Sustainability Agenda? (pp. 114–122). Colombo: Ceylon Institute of Builders – Sri Lanka.

Rathnayake, K.K.N.D., Jayasena, H.S., Madusanka, H.W.M. & Wijewickrama, M.K.C.S. (2017). Identifying Existing Constraints in Carbon Footprint Calculation Tools and Addressing the Improvements to BIM. In proceedings of 10th International Built Environment Research Conference of Faculty of Architecture Research Unit (FARU) 2017, (pp. 201-211). Colombo: Faculty of Architecture, University of Moratuwa, Sri Lanka.

Kalhara, G.W.N., & Jayasena, H. S. (2016). Capacity of Information Technology Infrastructure in Sri Lanka to Support Building Information Modelling Systems. The 5th World Construction Symposium 2016: Greening Environment, Eco-Innovations & Entrepreneurship (pp. 98-105). Colombo: Ceylon Institute of Builders – Sri Lanka.

Pathirana, A.P.N.Y.K., & Jayasena, H. S. (2016). Potential to Implement BIM Project with Sri Lankan Professionals. The 5th World Construction Symposium 2016: Greening Environment, Eco-Innovations & Entrepreneurship (pp. 362-369). Colombo: Ceylon Institute of Builders – Sri Lanka.

Disthikar, M. M. M., Jayasena H.S., and Ariyachandra, M. R. M. F. (2016). Strategies to Develop Effective BIM Models to Suit 4D Modelling, In: 9th FARU International Research Symposium 2016- Building the future- sustainable and resilient environments. Colombo, Sri Lanka: Faculty of Architecture Research Unit, pp. 277-287.

Kulasekara, G., Jayasena H.S., and Ariyachandra, M. R. M. F. (2016). Comparative Effectiveness of Quantity Surveying in BIM Implementation, In: 9th FARU International Research Symposium 2016- Building the future- sustainable and resilient environments. Colombo, Sri Lanka: Faculty of Architecture Research Unit, pp. 317-328.

Jayasena, H. A. E. C., Jayasena, H. S., & Yoosuff, M. Y. A. I. M. (2016). Economies of Off-site Concrete Construction with BIM. In Proceedings of the 7th International Conference on Sustainable Built Environment. Kandy, Sri Lanka.

Zuhair, M.Z.M., Jayasena, H. S., & Ariyachandra, M.R.M.F. (2016). Review on Lean Construction and TPS Approximation with BIM. The 5th World Construction Symposium 2016: Greening Environment, Eco-Innovations & Entrepreneurship (pp. 399-407). Colombo: Ceylon Institute of Builders – Sri Lanka.

Baduge, S., & Jayasena, H. S. (2016). Win-Win Settlement: Applicability of Negotiation Principles for Dispute Negotiations in Construction Projects. The 5th World Construction Symposium 2016: Greening Environment, Eco-Innovations & Entrepreneurship (pp. 555-566). Colombo: Ceylon Institute of Builders – Sri Lanka.

Suventhiny, J., & Jayasena, H. S. (2015). Effect of Accuracy and Timeliness of Information on Performance of Contractors. The 4th World Construction Symposium 2015: Sustainable Development in the Built Environment (pp. 239-250). Colombo: Ceylon Institute of Builders – Sri Lanka.

Dissanayake, T. L., Jayasena, H. S., & Abeynayake, M. (2015). The Legal Framework for Design Liability in Building Information Modelling. The 4th World Construction Symposium 2015: Sustainable Development in the Built Environment (pp. 493-502). Colombo: Ceylon Institute of Builders – Sri Lanka.

Rajaweera, A., Jayasena, H. S., & Dissanayake, T. L. (2015). BIM as an instrument to minimize sources of conflicts in construction projects. The 8th FARU International Conference ‘Making built environments responsive’ (pp. 396-404), Colombo: University of Moratuwa.

Kahandawa, K., & Jayasena, H. S. (2015). Partnering to Bridge the Gap Between Conventional and BIM Based Project Procurement. The 4th World Construction Symposium 2015: Sustainable Development in the Built Environment (pp. 382-390). Colombo: Ceylon Institute of Builders – Sri Lanka.

Jayasena, H. S., & Weddikkara, C. (2014). BIM Software Environment for Projects in Sri Lanka. Paper presented at the The 3rd World Construction Symposium, Colombo.

Faber, M. H., Giuliani, L., Revez, A., Jayasena, S., Sparf, J., & Mendez, J. M. (2014). Interdisciplinary Approach to Disaster Resilience Education and Research. Procedia Economics and Finance, 18, 601–609. doi: 10.1016/S2212-5671(14)00981-2

Jayasena, H. S., & Weddikkara, C. (2013). Assessing the BIM Maturity in a BIM Infant Industry. The Second World Construction Symposium 2013: Socio-Economic Sustainability in Construction (pp. 62-69). Colombo: Ceylon Institute of Builders – Sri Lanka. Mirror Link [ synopsis ]

Amarapathy, P., Jayasena, H. S., & Ranadewa, K. A. T. O. (2013). E-Tendering Framework for Public Procurement in Sri Lanka. The Second World Construction Symposium 2013: Socio-Economic Sustainability in Construction (pp. 218-225). Colombo: Ceylon Institute of Builders – Sri Lanka. Mirror Link

Abeyratne, A., & Jayasena, H. S. (2013).  The Reshuffle of Risks from Implementing BIM Based Integrated Project Delivery in Sri Lankan Construction Industry. The Second World Construction Symposium 2013: Socio-Economic Sustainability in Construction (pp. 441-450). Colombo: Ceylon Institute of Builders – Sri Lanka. Mirror Link

De Silva, R., & Jayasena, H. S. (2013). The Need for an Integrated Cost Modelling Framework for Building Information Modelling. The Second World Construction Symposium 2013: Socio-Economic Sustainability in Construction (pp. 427-434). Colombo: Ceylon Institute of Builders – Sri Lanka. Mirror Link

Jayasena, H. S., Seram, G. G., & Johnson, J. (2013). Frequently Challenged Determinations of the Engineer in Sri Lankan Construction Contracts. The Second World Construction Symposium 2013: Socio-Economic Sustainability in Construction (pp. 235-243). Colombo: Ceylon Institute of Builders – Sri Lanka. Mirror Link

Gunasekara, K., & Jayasena, H. S. (2013). Identification of a Technological Framework for Implementing Building Information Modelling In Sri Lanka. The Second World Construction Symposium 2013: Socio-Economic Sustainability in Construction (pp. 244-252). Colombo: Ceylon Institute of Builders – Sri Lanka. Mirror Link

Gnanarednam, M., & Jayasena, H. S. (2013). Ability of BIM to Satisfy CAFM Information Requirements. The Second World Construction Symposium 2013: Socio-Economic Sustainability in Construction (pp. 12-21). Colombo: Ceylon Institute of Builders – Sri Lanka. Mirror Link

Kulasekara, G., Jayasena, H. S., & Ranadewa, K. A. T. O. (2013). Comparative Effectiveness of Quantity Surveying in a Building Information Modelling Implementation. The Second World Construction Symposium 2013: Socio-Economic Sustainability in Construction (pp. 101-107). Colombo: Ceylon Institute of Builders – Sri Lanka. Mirror Link

Madusanka, I. K., & Jayasena, H. S. (2013). The Reshuffle of Contractual Liabilities by Implementing Integrated Project Delivery (IPD) in Building Information Modelling (BIM) Based Construction. The Second World Construction Symposium 2013: Socio-Economic Sustainability in Construction (pp. 435-440). Colombo: Ceylon Institute of Builders – Sri Lanka. Mirror Link

Nagalingam, G., Jayasena, H. S., & Ranadewa, K. A. T. O. (2013). Building Information Modelling and Future Quantity Surveyor’s Practice in Sri Lankan Construction Industry. The Second World Construction Symposium 2013: Socio-Economic Sustainability in Construction (pp. 81-92). Colombo: Ceylon Institute of Builders – Sri Lanka. Mirror Link

Wijayakumar, M., & Jayasena, H. S. (2013). Automation of BIM Quantity Take-Off to Suit QS’s Requirements. The Second World Construction Symposium 2013: Socio-Economic Sustainability in Construction (pp. 70-80). Colombo: Ceylon Institute of Builders – Sri Lanka. Mirror Link

Wijewardana, C., Jayasena, H. S., & Ranadewa, K. A. T. O. (2013). Impact of Government Policies and Regulations When Adopting Alternative Procurement Methods. The Second World Construction Symposium 2013: Socio-Economic Sustainability in Construction (pp. 253-260). Colombo: Ceylon Institute of Builders – Sri Lanka. Mirror Link

Jayasena, H. S., & Weddikkara, C. (2012). Building Information Modelling for Sri Lankan Construction Industry. World Construction Conference 2012 – Global Challenges in Construction Industry (pp. 196-201). Colombo: Ceylon Institute of Builders – Sri Lanka. Mirror Link

Jayasena, H. S., & Senevirathna, N. S. (2012). Adaptability of Integrated Project Delivery in a Construction Industry. World Construction Conference 2012 – Global Challenges in Construction Industry (pp. 188-195). Colombo: Ceylon Institute of Builders – Sri Lanka. Mirror Link

Baduge, S., & Jayasena, H. S. (2012). Application of Concurrency in Delay Claims. World Construction Conference 2012 – Global Challenges in Construction Industry (pp. 69-78). Colombo: Ceylon Institute of Builders – Sri Lanka. Mirror Link

Jayasena, H. S., & Kavinda, Y. H. (2012). Most Appropriate Dispute Resolution Strategy for Sri Lankan Construction Industry. World Construction Conference 2012 – Global Challenges in Construction Industry (pp. 180-187). Colombo: Ceylon Institute of Builders – Sri Lanka. Mirror Link

Jayasena, S., & Alwis, P. (2011). Disruption Claims in Sri Lankan Construction Industry. Disruption Claims in Sri Lankan Construction Industry (pp. 94-101). Colombo: PAQS.

Jayasena, S., & Kumarasinghe, A. (2011). The grounds for effect of readability of contract clauses on occurrence of construction disputes. 15th Pacific Association of Quantity Surveyors Congress (pp. 102-110). Colombo: PAQS.

Ahamed, A. R., Karunasena, G., Jayasena, S., Senevirathne, I., & Perera, S. (2010). Exploring status of e-procurement: A case of construction industry in Sri Lanka. Proceedings of the 6th International Conference on Innovation in Architecture, Engineering and Construction (pp. 456-465). PA: The Pennsylvania State University.

Gunatilake, S., Liyanage, C., & Jayasena, H. S. (2010). Investigating the adaptability of relational contracting (RC) practices – the Sri Lankan context. CIB 2010 world congress (pp. 663-674). Salford, United Kingdom: CIB. Mirror Link

Yatanwala, S., Gunatilake, S., Jayasena, S. and Liyanage, C. (2009). Use of PFI as a tool for delivering transport infrastructure in developing countries: The Sri Lankan Context. 13th Pacific Association of Quantity Surveyors Congress, Kuala Lumpur, Malaysia. Mirror Link

Fernando, M. N., & Jayasena, H. S. (2008). Practising energy efficient design for commercial buildings in Sri Lankan industry. International Conference on Building Education and Research, Building Resilience (pp. 144-145). Kandalama, Sri Lanka: CIB. Mirror Link

Gunathilake, S., & Jayasena, H. S. (2008). Developing a relational approach to contracting: the Sri Lankan context. International Conference on Building Education and Research, Building Resilience (pp. 280-281). Kandalama, Sri Lanka: CIB. Mirror Link

Jayasena, H. S., & Uhanowitage, R. (2008). The Effect of Winner’s Curse on Post-Contract Management. International Conference on Building Education and Research, Building Resilience (pp. 284-285). Kandalama, Sri Lanka: CIB. Mirror Link [ Synopsis ]

Jayawardena, H. K., Senevirathne, K., & Jayasena, H. S. (2008). Skilled Workforce in Sri Lankan Construction Industry: Production Vs. Acceptance. International Conference on Building Education and Research, Building Resilience (pp. 82-83). Kandalama, Sri Lanka: CIB. Mirror Link

Joseph, A. L., & Jayasena, H. S. (2008). Impediments to the Development of Design and Build Procurement System in Sri Lanka. International Conference on Building Education and Research, Building Resilience (pp. 286-287). Kandalama, Sri Lanka: CIB. Mirror Link

Yatanwala, Y. W., & Jayasena, H. S. (2008). Failure of Applying PFI in Colombo Katunayake Expressway Project. International Conference on Building Education and Research, Building Resilience (pp. 286-287). Kandalama, Sri Lanka: CIB. Mirror Link

Johnson, J., Peansupap, V., & Jayasena, S. (2007). Balanced scorecard performance measurement and contractor selection using a web-based system. 5th International Conference on Construction Project Management – 2nd International Conference on Construction Engineering and Management. Singapore: Nanyang Technological University.

Johnson, J., Jayasena, H. S., & Johnson, S. (2005). The role of balanced scorecard in a performance based procurement system. International Symposium of the Working Commission CIB W92 (pp. 485-494). Nevada, USA: PBSRG.

Johnson, J., & Jayasena, H. S. (2003). Performance measurement and management: How to use a Balanced Scorecard approach. 7th Pacific Association of Quantity Surveyors Congress (pp. 260-269). Tokyo: Building Surveyors Institute of Japan.

Perera, R. S., Siriwardena, M. L., & Jayasena, H. S. (2001). Establishing a web based information centre for the Sri Lankan construction industry. International postgraduate research conference in the Built and Human Environment (pp. 696-704). Salford, United Kingdom: University of Salford.

Books and Book Chapters

Rogers, J., Chong, H.-Y., Preece, C., Lim, C. C., & Jayasena, H. S. (2015). BIM Development and Trends in Developing Countries: Case Studies: Bentham Science.

Other publications

Jayasena, H. S., Siriwardane, M., & Migliaccio, G. (2019). Public–private partnerships: Potentials, prospects, pitfalls and precautions. Editorial: Built Environment Project and Asset Management, 9(2), 170–171. [ DOI Link ]

Madushanka, H.I.W., Jayasena, H.S. & Wijewickrama, M.K.C.S. (2018). Applicability of BIM in Construction Waste Minimization of Sri Lankan Construction Industry. In proceedings of Annual Technical Session 2017: “Next Generation Technology for Quantity Surveying and cost Engineering Documentation”. (pp.20-25). Colombo: Institute of Quantity Surveyors

Jayasena, S. (2014). Expanding IT related career opportunities with advent of BIM. EDEX Magazine, 4(2), pp. 44-45. Sinhala Translation : Full PDF

Jayasena, H. S., & De Silva, R. (2013). Building cost information modelling framework. Paper presented at the International Quantity Surveying BIM Conference, Hong Kong Polytechnic University, Hong Kong.

Jayasena, S. (2012). Integrated Project Delivery – A novel procurement method. ICTAD Journal, 10, 41 – 45.

Jayasena, H. S. (2006). Bid-price variability in the Sri Lankan Construction Industry. Singapore: Unpublished MSc Thesis, National University of Singapore.

Jayasena, H. S. (2000). Construction Profile: an informative web for Sri Lankan construction industry, Unpublished undergraduate dissertation, Department of Building Economics, University of Moratuwa, Sri Lanka.